{
  "dataset": "Culebra Public Works Investment Tracker",
  "publisher": "Todo Culebra",
  "url": "https://www.todoculebra.com/culebra-public-works.html",
  "machineReadable": "https://www.todoculebra.com/culebra-public-works.json",
  "license": "CC BY 4.0 — free to reuse with attribution to Todo Culebra (todoculebra.com)",
  "citeAs": "Culebra Public Works Investment Tracker, Todo Culebra, 2026. https://www.todoculebra.com/culebra-public-works.html",
  "lastUpdated": "2026-07-23",
  "methodology": "Primary sources: official COR3 and PR Ports Authority project signs photographed on-site in Culebra on 2026-07-21 with geotagged coordinates, cross-verified against the Municipio de Culebra public announcement of July 2026. Figures are as posted by the issuing agencies. Contractor identities, execution dates, terms, and registered amounts verified against the Puerto Rico Office of the Comptroller's public contract registry (consultacontratos.ocpr.gov.pr) on 2026-07-23: Municipio de Culebra contract 2026-000059 — Harry Auto Kool Inc., executed 2026-05-19, registered $4,035,632.66; Autoridad de los Puertos contract 2021-000061 — Desarrolladora J.A., Inc., executed 2020-11-10, original $6,249,910 with amendments A–I extending the term through 2027-06-30 and raising the cumulative registered value to $15,227,437.70.",
  "geography": { "island": "Culebra", "municipality": "Culebra, Puerto Rico", "population2020Census": 1792 },
  "totals": {
    "activeProjects": 10,
    "totalInvestmentUSD": 10285558.13,
    "municipalRoadPackageUSD": 4035648.13,
    "portsAuthorityUSD": 6249910.00,
    "investmentPerResidentUSD": 5740,
    "jobsReported": { "municipalContract": 32, "airportContract": 74, "note": "Jobs are reported per contract by the agencies, not per individual road segment." }
  },
  "programs": [
    { "agency": "COR3 (Oficina Central de Recuperación, Reconstrucción y Resiliencia)", "program": "Pavimentación y/o Reconstrucción de Carreteras Municipales", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "contractExecuted": "2026-05-19", "contractTerm": "2026-05-19 to 2026-08-30", "registryAmountUSD": 4035632.66, "registrySource": "PR Office of the Comptroller contract registry (consultacontratos.ocpr.gov.pr), Municipio de Culebra, retrieved 2026-07-23", "funding": "Federal recovery funds", "jobsReported": 32 },
    { "agency": "Autoridad de los Puertos (PR Ports Authority)", "program": "Rehabilitación del Pavimento de la Pista 13-31 y la Antepista", "contract": "2021-000061", "contractor": "Desarrolladora J.A., Inc.", "contractExecuted": "2020-11-10", "contractTerm": "2020-11-10 to 2027-06-30 (extended by amendments A–I)", "registryAmountUSD": 6249910.00, "registryNote": "The posted sign amount $6,249,910 is the original 2020 contract. Registry amendments G (+$936,216.78, Aug 2025) and H (+$8,041,310.92, Jan 2026) raise the cumulative registered value to $15,227,437.70; amendment I (May 2026) extends the term through 2027-06-30.", "registrySource": "PR Office of the Comptroller contract registry (consultacontratos.ocpr.gov.pr), Autoridad de los Puertos, retrieved 2026-07-23", "funding": "Public", "jobsReported": 74 }
  ],
  "projects": [
    { "id": "calle6-villa-flamenco", "name": "Calle #6, Sector Villa Flamenco", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 57474.00, "lat": 18.310152, "lng": -65.29833, "coordinatesApproximate": false, "status": "active", "signPhotographed": "2026-07-21" },
    { "id": "tamarindo-road", "name": "Tamarindo Road", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 915749.28, "lat": 18.3148, "lng": -65.3172, "coordinatesApproximate": true, "status": "active", "signPhotographed": "2026-07-21", "visitorNote": "Access road to Playa Tamarindo (turtle snorkeling)." },
    { "id": "road250-fulladosa", "name": "Road 250, Sector Fulladosa", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 1483610.99, "lat": 18.302015, "lng": -65.299694, "coordinatesApproximate": false, "status": "active", "signPhotographed": "2026-07-21" },
    { "id": "jesus-m-ortiz", "name": "Road Jesús M. Ortiz", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 40067.56, "lat": 18.308232, "lng": -65.302653, "coordinatesApproximate": false, "status": "active", "signPhotographed": "2026-07-21" },
    { "id": "barriada-clark", "name": "Calle #2 int. Calle #3, Ext. Barriada Clark", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 124396.92, "lat": 18.30807, "lng": -65.300568, "coordinatesApproximate": true, "status": "active", "signPhotographed": "2026-07-21" },
    { "id": "william-font", "name": "Calle William Font", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 322619.06, "lat": 18.302584, "lng": -65.302373, "coordinatesApproximate": false, "status": "active", "signPhotographed": "2026-07-21" },
    { "id": "punta-soldado", "name": "Carretera de Punta Soldado", "type": "Road repaving/reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 154230.13, "investmentNote": "approximate, per municipal announcement", "lat": 18.29, "lng": -65.2905, "coordinatesApproximate": true, "status": "active", "source": "Municipio de Culebra announcement, July 2026" },
    { "id": "box-culvert-la-perla", "name": "Box Culvert, Sector La Perla", "type": "Drainage structure (box culvert)", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 115237.69, "lat": 18.3115, "lng": -65.2918, "coordinatesApproximate": true, "status": "active", "signPhotographed": "2026-07-21", "note": "Flood-mitigation infrastructure." },
    { "id": "la-perla-puente", "name": "Sector La Perla y Puente", "type": "Road + bridge reconstruction", "agency": "COR3", "contract": "2026-000059", "contractor": "Harry Auto Kool Inc.", "investmentUSD": 822262.50, "lat": 18.3128, "lng": -65.2927, "coordinatesApproximate": true, "status": "active", "signPhotographed": "2026-07-21" },
    { "id": "airport-runway", "name": "Runway 13-31 + Taxiway Rehabilitation, Benjamín Rivera Noriega Airport", "type": "Airport pavement rehabilitation", "agency": "Autoridad de los Puertos", "contract": "2021-000061", "contractor": "Desarrolladora J.A., Inc.", "investmentUSD": 6249910.00, "lat": 18.3131, "lng": -65.3046, "coordinatesApproximate": false, "status": "active", "signPhotographed": "2026-07-21", "visitorNote": "Flights generally continue during phased work — confirm with your airline." }
  ]
}
