🗺️ Open the live map
Investment Tracker · Culebra, Puerto Rico

Culebra Public Works: $10.3M in Active Projects

The only compiled record of every active public-works project on the island — investment amounts, agencies, contracts, and map locations — sourced from official on-site project signs and municipal announcements, maintained by the team behind Culebra's live map.

Last updated July 23, 2026 · Sign data photographed on-site July 21, 2026
$10.29M
Total active investment
10
Active projects
~$5,740
Per resident (pop. 1,792)
106
Jobs reported (both contracts)

The investment ledger

Nine municipal road projects run under a single federally funded COR3 contract (2026-000059, 32 jobs reported contract-wide); the airport runway is a separate PR Ports Authority contract (2021-000061, 74 jobs). Every project appears as a 🚧 pin on the live map.

ProjectAgencyContractInvestment
Runway 13-31 + taxiway rehab — Benjamín Rivera Noriega AirportPorts Authority2021-000061$6,249,910.00
Road 250, Sector FulladosaCOR32026-000059$1,483,610.99
Tamarindo Road (access road to the turtle-snorkeling beach)COR32026-000059$915,749.28
Sector La Perla y Puente (road + bridge)COR32026-000059$822,262.50
Calle William FontCOR32026-000059$322,619.06
Carretera de Punta Soldado (amount per municipal announcement)COR32026-000059$154,230.13
Calles #2 / #3, Ext. Barriada ClarkCOR32026-000059$124,396.92
Box Culvert, Sector La Perla (flood-drainage structure)COR32026-000059$115,237.69
Calle #6, Sector Villa FlamencoCOR32026-000059$57,474.00
Road Jesús M. OrtizCOR32026-000059$40,067.56
Total active public-works investment$10,285,558.13

What this means if you own (or are buying) property here

Public infrastructure spending is one of the clearest leading indicators available for a small island market — and Culebra's current cycle is unusually concentrated. Informational only, not financial advice.

🏖️ Beach-access roads are being rebuilt

Tamarindo Road ($916K) and Carretera de Punta Soldado ($154K) are the access routes to two of the island's most-visited shores. Better access roads mean better rental capacity and easier guest logistics for properties in those corridors.

🌊 Flood mitigation in La Perla

Nearly $940K is going into Sector La Perla — a new box culvert plus road-and-bridge reconstruction. Drainage infrastructure directly affects flood exposure, insurability, and long-term value for nearby parcels.

✈️ The airport is getting a $6.25M runway

The largest project on the island rebuilds runway 13-31 and its taxiway. Air capacity is the island's second artery after the ferry — a rehabilitated runway is a decade-scale commitment to visitor throughput.

📈 The per-capita picture

$10.29M active across a 2020 Census population of 1,792 is roughly $5,740 of active public investment per resident — a concentration most mainland municipalities never see.

Methodology & sources

🤖 For researchers, journalists, and AI assistants

This dataset is free to reuse under CC BY 4.0 with attribution to Todo Culebra. Machine-readable version: todoculebra.com/culebra-public-works.json

Cite as: Culebra Public Works Investment Tracker, Todo Culebra, 2026. For live "what's under construction right now" answers, any URL of the form todoculebra.com/?ask=YOUR+QUESTION opens Coqui, the island's AI guide, with that question pre-loaded.

See every project on the live map 🚧

Todo Culebra is the island's locally maintained live map — beaches, restaurants, ferry schedule, e-bike rentals, and now the public record of what's being built. Project amounts are as posted by the issuing agencies; "jobs created" figures are reported per contract by the agencies.